Lot 2a - Revision list 2021.02.24 - Updated both the zoning and permit drawings 2021.02.24 - Removed the one step from the first floor plan at the front porch for clarity 2021.02.24 - Added all files to the web 2021.02.24 - Reduced the front porch depth by 6" to comply with zoning 2021.02.24 - Reduced the front porch front overhang to 0" to comply with zoning changed roof pitch 2021.02.24 - added risers to the mud room 2021.02.24 - added risers to the front entry 2021.02.24 - change the building section and elevations to match risers in floor plans 2021.02.24 - added structure to support lower first floor areas